BTM development

Faith Community Solar & Storage — Metro Atlanta

8 MW DC ground + rooftop solar paired with 2 MW / 4 MWh BESS for a major faith community in the Atlanta metro. Georgia Power PLL program. 40% ITC (domestic content). 54% onsite load offset. Phase 2 includes generation for adjacent low-income housing. NTP target Q2 2026; COD Q4 2026.