Our Project Portfolio

11 projects • 809 MW in development • 18 states

BTM operational

Bright Star Education

Rooftop solar installation for multiple daycare facilities across Georgia, providing clean energy and significant cost savings for educational institutions.

2.50 MW • GA • $80000.00/yr savings
BTM development

California Oil and Gas Project

Ground mount solar installs for multiple O&G locations throughout California, combining traditional energy operations with renewable solar power generation.

17.00 MW • CA • $880000.00/yr savings
DATA_CENTER development

Data Center Natural Gas Turbine

High-efficiency natural gas turbine power generation facility designed to provide reliable, continuous power for critical data center operations with industry-leading uptime.

100.00 MW • VA • $1200000.00/yr savings
STORAGE development

South Georgia Battery Storage

3 MW / 12 MWH battery-only energy storage project in South Georgia providing grid stabilization, peak shaving, and renewable energy integration services for utility and commercial customers.

3.00 MW • GA • $125000.00/yr savings
FTM development

Ventura County Utility Solar — Phase 1

16.8 MW DC utility-scale solar facility in Ventura County under NEM 2.0 financing. Most advanced project in the California portfolio — EPC negotiation stage with financing structure in place. Target EPC cost $1.15/W.

16.84 MW • CA
FTM development

Central Valley Solar Portfolio

25.4 MW DC across 5 sites in Stanislaus and Merced counties, California. All sites have executed lease options and PG&E interconnection applications accepted and in study as of January 2026. Four of five sites qualify for the Low Income ITC adder (+10%). Adjacent sites enable combined development and single EPC mobilization efficiencies. Budget EPC estimate ~$1.15/Wac pending preliminary engineering (Q2 2026). Total site area: 199 acres.

25.40 MW • CA
BTM development

Faith Community Solar & Storage — Metro Atlanta

8 MW DC ground + rooftop solar paired with 2 MW / 4 MWh BESS for a major faith community in the Atlanta metro. Georgia Power PLL program. 40% ITC (domestic content). 54% onsite load offset. Phase 2 includes generation for adjacent low-income housing. NTP target Q2 2026; COD Q4 2026.

8.00 MW • GA
BTM operational

Georgia Legacy Solar Portfolio Acquisition

Acquisition and repower play across three operating Georgia solar sites totalling 2.73 MW DC — located in Waycross, Emory, and Barrow. Existing PPAs in place at $0.13–$0.141/kWh. 20% repower capacity expansion to 3.28 MW DC. 24-year cumulative EBITDA estimated at $6.78M; DCF value at 10% discount rate: $3.36M. OGI earns origination fee + EPC contract on repower.

2.73 MW • GA • $464026.00/yr savings
FTM development

Louisiana Utility Solar Acquisition

200 MW AC pre-NTP utility solar acquisition play in Louisiana. OGI contracted acquisition model: OGI sources and contracts, capital partner funds close, OGI manages EPC. Acquisition price ~$0.04/W; EPC target ~$1.05/W. Advanced permitting and site control in place.

200.00 MW • LA
DATA_CENTER development

Augusta Data Center Campus

100 MW capacity data center campus in Augusta, Georgia targeting hyperscaler colocation tenants including Google, Microsoft Azure, and AWS. Site anchored by adjacent industrial BESS and positioned within Georgia Power territory. Ground lease and hyperscaler pursuit in active negotiation. OGI data center JV partnership in place.

100.00 MW • GA
DATA_CENTER development

Texas Data Center Campus — 334 MW Site

Dual-use data center campus co-located with the 334 MW West Texas solar farm in Castro County. Approximately 500 acres available post-solar buildout for hyperscaler data center infrastructure. Creditworthy data center operator PPA term sheet ready at $0.31/kWh fixed, 10-year term. Active pursuit with Google, Azure, and AWS. OGI data center JV partner available for execution.

334.00 MW • TX

Start Your Project →